Windows and doors in Doncaster

Doncaster's the far end of the patch for Luke and Dale, but it isn't new ground. They'll happily fit a single front door, though they really come into their own when a whole house is being done up.

If you're after new windows and doors in Doncaster, Luke and Dale come over from Hoyland to do the job. There are just the two of them, with fifteen years in the trade behind them. They measure, price and fit every job themselves, so the people you speak to at the start are the same two who turn up to fit it. Doncaster's further out than most of their work, so it's worth a quick call to check they can fit you in before you set your heart on a date.

The job further down is one of theirs, a full renovation in Doncaster, and it shows why the order of work matters. If you're in the middle of doing a house up, you'll know the glazing can't be left until the end, but you don't want it going in too early either. Get the timing right and you save money and a lot of mess, and it's easier than it sounds once you know what comes when.

Close to home

A property renovation in Doncaster, with windows and doors fitted throughout. The firm running the job gave them five stars for an honest price, keeping to the date and leaving the place clean.

When should new windows go in during a renovation?

After any work on the openings themselves, and before the plasterer arrives. Get that the wrong way round and you'll either be paying to protect brand new frames from weeks of dust and plaster, or paying to make good around them twice, which nobody wants on a budget that's already stretched. On most jobs, it goes something like this.

  1. Openings first

    If an opening's being made bigger, moved or knocked through, the new lintel needs to be in and the brickwork made good before anyone measures for a frame. Altering the structure like that falls under building regulations, so you'll need approval for it.

  2. Then measure

    Every frame's made for its opening, so it has to be measured from the finished brickwork, not from a drawing. Order from a guess and they'll turn up too big or too small, and a frame built to size can't just be sent back.

  3. Frames in before the plastering

    New windows go in while the walls are still bare, so your plasterer can finish neatly up to the frames and the window boards. Leave them until afterwards and someone ends up cutting into brand new plaster.

  4. External doors early

    An empty house is a lot easier to keep secure and dry once the front and back doors are on and locking. That's why many renovations get the doors in as soon as the openings are ready.

  5. Protect what's fitted

    New uPVC frames usually come with a protective film on them. Leave it on until the dusty trades have finished and then peel it off, which beats scraping dried plaster off the frames later.

Decisions to make before anyone measures

  • The colour, inside and out. You can have frames white inside with a colour outside, or the same colour on both sides. Decide once for the whole house so the doors and windows all match.
  • Which windows open. Fixed panes are cheaper and slimmer, but every room still needs a window that opens for fresh air.
  • Escape windows upstairs. Upstairs rooms usually need a window you could climb out of in a fire. Council guidance puts that at a clear opening of about 0.33 square metres, at least 450mm high and 450mm wide, with the bottom of the opening part no more than 1100mm above the floor. A replacement should never be worse for escape than the window it's replacing.
  • Safety glass where people walk. Glass in doors, next to doors and low down near the floor has to be toughened or laminated, which means if it does break, it breaks safely.
  • Obscure glass for bathrooms. It's easy to choose at the measuring stage, and awkward and costly to change once the units have been made and fitted.

More than anything, what keeps a renovation on time is a glazing firm that turns up when the walls are ready for them, and that's what the Doncaster review above picks out. It comes up in their other reviews too: four separate customers have said Luke and Dale showed up on the day they'd promised, and all 19 of their Google reviews are five stars.

When you ring about a renovation, it helps to know roughly where the job's up to. Which openings are staying as they are, which ones are changing, and when's the plasterer booked? With that in front of them, Luke and Dale can tell you straight whether the timing works and when they'd need to come and measure.

Windows and doors in Doncaster, without the building work

Just changing a door or a few windows? Then you can forget about lintels and plasterers, and it's a much simpler job. A composite front door takes a day. Replacement windows can go in all at once or a few at a time, whichever suits you, and where the frames are sound and it's only the glass that's misted, new sealed units might be all you need. For opening up the back of the house, have a look at bifold and sliding doors, and for a conservatory you can't use for half the year, there's a solid roof. If you're not quite in Doncaster, the other towns L&D cover are on the areas page, nearest first.

Doncaster questions

Which parts of Doncaster do you cover?

The western side of the borough is nearest to Hoyland, which takes in Mexborough, Conisbrough, Sprotbrough and the town itself. Further east, out towards Armthorpe and Thorne, is still South Yorkshire, but it's a longer trip, so it's best to ask first.

Can you work alongside my builder?

Yes. On a renovation the glazing's just one trade among several, so the useful thing is to agree with your builder when the openings will be ready and book the fit for that day. Luke and Dale will gladly talk it through with whoever's running the job.

Do I need building regulations approval to make a window opening bigger?

Usually, yes, because a bigger opening means a new or longer lintel carrying the wall above, and that's structural work. Swapping a window into the same opening is a different matter from cutting a new one, so mention which you're planning when you get in touch.

Can I stay in the house while the windows are replaced?

In most cases, yes. A window's usually taken out and its replacement fitted before the next one comes out, so a room's only open for a short time. If someone's at home all day, mention it when they come to measure and they'll explain how your job will run.

Thinking about a door, windows or a conservatory in Doncaster?

A front door, a houseful of windows, or a conservatory you have stopped using. Send it over and we will come out, measure up and give you a price for it.

Free quote, no obligation. 5.0 from 19 Google reviews.

A garden room with a glazed lantern roof at the end of a patio